+Article 53 7.

Article 53 7.

Where the scheme owner fails or refuses to take the necessary remedial action, and where the Commission has determined that the failure or deficiencies referred to in paragraph 6 of this Article compromise the ability of the economic operator referred to in Article 48(1) implementing the scheme to comply with the requirements laid down in Articles 48, 49, 50 and 52 or where repeated or significant cases of non-compliance by economic operators implementing a scheme are due to deficiencies in the scheme, the Commission shall adopt an implementing act withdrawing the recognition of equivalence of the scheme. That implementing act shall be adopted in accordance with the examination procedure referred to in Article 90(3).

1. Overview

,
Summary Regulation

1.1 References

1.2 Identified Requirements

1.3 Related Standards

2. Identified Requirements

Requirements
Source Requirement

3. Related Standards

Standards
Source Requirement
  • Builddate: 13.08.2026 00:00:00 -Doknr: CELEX:32023R1542
  • EULAW -

    EN: Legal acts of the European Union from EUR-Lex, https://eur-lex.europa.eu/. © European Union. Re-use is authorised by Decision 2011/833/EU, provided the source is acknowledged; the consolidated texts are licensed under CC BY 4.0 (EUR-Lex legal notice). Divided into sections and converted into the GRCA format, the wording unchanged. Only the legislation published in the Official Journal of the European Union is deemed authentic.

    DE: Rechtsakte der Europäischen Union aus EUR-Lex, https://eur-lex.europa.eu/. © Europäische Union. Weiterverwendung nach Beschluss 2011/833/EU mit Quellenangabe gestattet; die konsolidierten Fassungen stehen unter CC BY 4.0 (Rechtlicher Hinweis von EUR-Lex). In Abschnitte aufgeteilt und in das GRCA-Format umgewandelt, der Wortlaut unverändert. Verbindlich sind allein die im Amtsblatt der Europäischen Union veröffentlichten Rechtsakte.