+Scenario C/E 3: Downstream contagion
|
Scenario C/E 3: Downstream contagion
In a variation on scenario C/E 1 above, B1 also controls two entities (B2 and B3 ). In this case, the financial difficulties of A will pass through A2 and B1 down to the two subsidiaries of B1 (‘downstream contagion’). Grouping requirement:
1. Overview
1.1 References
1.2 Identified Requirements
1.3 Related Standards
2. Identified Requirements
Requirements
| Source |
Requirement |
3. Related Standards
Standards
| Source |
Requirement |
- EBA - Published by the European Banking Authority at https://www.eba.europa.eu/
|