+Scenario C/E 3: Downstream contagion
|
Scenario C/E 3: Downstream contagion
In a variation on scenario C/E 1 above, B1 also controls two entities (B2 and B3 ). In this case, the financial difficulties of A will pass through A2 and B1 down to the two subsidiaries of B1 (‘downstream contagion’). Grouping requirement:
1. Pārskats
1.1 Atsauces
1.2 Identificētās prasības
1.3 Saistītie standarti
2. Identificētās prasības
3. Saistītie standarti
- EBA - Published by the European Banking Authority at https://www.eba.europa.eu/
|