+14. Institutions, for determining the overall recovery capacity (ORC), should define the following …

14. Institutions, for determining the overall recovery capacity (ORC), should define the following …

Institutions, for determining the overall recovery capacity (ORC), should define the following components in accordance with Section I of these guidelines:

  • a. a list of credible and feasible recovery options;
  • b. a range of scenarios of severe macroeconomic and financial stress.

1. Overview

,
Summary Regulation

1.1 References

1.2 Identified Requirements

1.3 Related Standards

2. Identified Requirements

Requirements
Source Requirement

3. Related Standards

Standards
Source Requirement
  • EBA - Published by the European Banking Authority at https://www.eba.europa.eu/