+4. Setting the framework of overall recovery capacity (ORC) for institutions
---+14. Institutions, for determining the overall recovery capacity (ORC), should define the following …
---+15. Following the definition of the previous components, institutions should determine the ORC as a …
---+Section I. ORC basic components
---+List of credible and feasible recovery options
------+16. The starting point for the determination of the ORC should be a comprehensive full list of …
------+17. To ensure that the ORC effectively represents the ability of the institutions to restore their …
------+18. The general factors for the credibility and feasibility assessment of the recovery options to …
---+Range of scenarios of severe macroeconomic and financial stress
------+19. The other component of the ORC is the ‘range of scenarios of severe macroeconomic and financial …
------+20. To calculate the ‘scenario-specific recovery capacity’, institutions should assume that the …
------+21. In the exceptional circumstances where an institution argues that it is not able to draw up a …
---+Section II. Calculating ‘scenario-specific recovery capacity’
---+Starting point
------+22. Institutions should consider as the starting point for the calculation of the …
---+Timeframe
------+23. When assessing the expected timeframe for the recovery option as referred to in Article …
------+24. Institutions should calculate the effects of the implementation of their recovery options, for …
------+25. For recovery options with a longer timeframe than the ones set out in paragraph 24, only the …
---+Representation
------+26. Institutions should express their ‘scenario-specific recovery capacity’ at least for the …
------+27. Institutions should express their ‘scenario-specific recovery capacity’ by reporting the sum of …
---+Section III. Determining the ORC
---+Step 1 – Selection of recovery options
------+28. To calculate the ‘scenario-specific recovery capacity’, institutions should select from the …
---+Step 2 – Adjustment of recovery options: additional constraining factors
------+29. When selecting recovery options appropriate to a specific scenario, institutions should take …
---+Step 3 – Calculation of ‘scenario-specific recovery capacity’
------+30. When calculating the ‘scenario-specific recovery capacity’, institutions should employ a …
---+Step 4 – Determination of the ORC range
------+31. To determine the ORC range, institutions should consider the highest and lowest …
|
4. Setting the framework of overall recovery capacity (ORC) for institutions
4. Setting the framework of overall recovery capacity (ORC) for institutions
1. Overview
1.1 References
1.2 Identified Requirements
1.3 Related Standards
2. Identified Requirements
Requirements
| Source |
Requirement |
3. Related Standards
Standards
| Source |
Requirement |
- EBA - Published by the European Banking Authority at https://www.eba.europa.eu/
|