+4.2 Content of the recovery plan
---+15. The recovery plan should be made up of all the following elements: a) The summary of the key …
|
4.2 Content of the recovery plan
4.2 Content of the recovery plan
1. Overview
| Summary |
Regulation |
|
15. The recovery plan should be made up of all the following elements: a) The summary of the key …
|
The recovery plan should be made up of all the following elements: - a) The summary of the key elements of the recovery plan, as further specified in Section 4.3 of these guidelines.
- b) Information on governance, including a framework of recovery plan indicators and monitoring thresholds, as further specified in Section 4.4 of these guidelines.
- c) The description of the applicable recovery options, including at least a recovery scenario analysis, a description of preparatory measures and information on the preservation of services as further specified in Section 4.5 of these guidelines.
- d) The recovery plan’s communication and disclosure plan, as further specified in Section 4.6 of these guidelines.
|
,
1.1 References
1.2 Identified Requirements
1.3 Related Standards
2. Identified Requirements
Requirements
| Source |
Requirement |
3. Related Standards
Standards
| Source |
Requirement |
- EBA - Published by the European Banking Authority at https://www.eba.europa.eu/
|