+Article 28 Implementation of the performance scheme
---+Article 28 (a)
---+Article 28 (b)
---+Article 28 (c)
---+Article 28 (d)
---+Article 28 (e)
---+Article 28 (f)
---+Article 28 (g)
---+Article 28 (h)
---+Article 28 (i)
---+Article 28 (j)
---+Article 28 2
|
Article 28 Implementation of the performance scheme
For the implementation of the performance scheme, the Commission shall adopt implementing acts laying down detailed requirements and procedures in respect of Article 21(4) and Articles 22 to 27, in particular as regards:
1. Resumen
| Título |
Regulación |
|
Article 28 (a)
|
the preparation, development, assessment, approval and revision of performance plans;
|
|
Article 28 (b)
|
the setting of performance targets, the criteria and conditions for their assessment, including for assessing the consistency of targets for en route air navigation services with Union-wide performance targets, and a methodology to define breakdown values;
|
|
Article 28 (c)
|
general principles for the allocation of common costs between en route and terminal air navigation services, as referred to in Article 21(4), point (l);
|
|
Article 28 (d)
|
the monitoring of performance plans, of the performance of network functions, alert mechanisms for revision of performance plans and targets and for the revision of Union-wide performance targets during the course of a reference period and issuance of corrective measures as referred to in Articles 21(4), 23, 24, 25 and 27;
|
|
Article 28 (e)
|
the timetables for all procedures;
|
|
Article 28 (f)
|
a mechanism to address events, referred to in Article 21(4), point (m);
|
|
Article 28 (g)
|
the setting of key performance indicators and indicators for monitoring. The Commission is empowered to set key performance indicators for terminal air navigation services in the key performance area of climate and environment once it is possible to establish indicators which are valid, reliable and measurable. Those indicators shall as a minimum be capable of demonstrating and measuring the impacts in that area which can be directly influenced by the air navigation service providers;
|
|
Article 28 (h)
|
methodology for benchmarking;
|
|
Article 28 (i)
|
the incentive schemes;
|
|
Article 28 (j)
|
conditions for the establishment of the joint performance plans.
|
|
Article 28 2
|
Those implementing acts shall be adopted in accordance with the examination procedure referred to in Article 48(3).
|
,
1.1 Referencias
1.2 Requisitos identificados
1.3 Estándares relacionados
2. Requisitos identificados
Requisitos
| Fuente |
Requisito |
3. Estándares relacionados
Estándares
| Fuente |
Requisito |
|