+3. For all offshore components, LDAR surveys shall be carried out at the following minimum …
|
3. For all offshore components, LDAR surveys shall be carried out at the following minimum …
|
3.
|
For all offshore components, LDAR surveys shall be carried out at the following minimum frequency:
|
Type of LDAR survey
|
Type of component
|
Frequency
|
|
Type 1 LDAR survey
|
Offshore components above the sea level
|
12 months
|
|
|
Offshore components below the sea level
|
24 months
|
|
|
Offshore components below the seabed
|
36 months
|
|
Type 2 LDAR survey
|
Offshore components above the sea level
|
24 months
|
|
1. Resumen
1.1 Referencias
1.2 Requisitos identificados
1.3 Estándares relacionados
2. Requisitos identificados
Requisitos
| Fuente |
Requisito |
3. Estándares relacionados
Estándares
| Fuente |
Requisito |
|