+3. For all offshore components, LDAR surveys shall be carried out at the following minimum …

3. For all offshore components, LDAR surveys shall be carried out at the following minimum …

3.

For all offshore components, LDAR surveys shall be carried out at the following minimum frequency:

Type of LDAR survey

Type of component

Frequency

Type 1 LDAR survey

Offshore components above the sea level

12 months

 

Offshore components below the sea level

24 months

 

Offshore components below the seabed

36 months

Type 2 LDAR survey

Offshore components above the sea level

24 months