|
+Article 17 8. |
Article 17 8.For a production installation, the verification scheme shall be in place prior to the completion of the design. For a non-production installation, the scheme shall be in place prior to the commencement of operations in the offshore waters of Member States.
1. Ülevaade
1.1 Viited1.2 Tuvastatud nõuded1.3 Seotud standardid2. Tuvastatud nõuded
3. Seotud standardid
|