|
+Article 17 8. |
Article 17 8.For a production installation, the verification scheme shall be in place prior to the completion of the design. For a non-production installation, the scheme shall be in place prior to the commencement of operations in the offshore waters of Member States.
1. Yleiskatsaus
1.1 Viittaukset1.2 Tunnistetut vaatimukset1.3 Liittyvät standardit2. Tunnistetut vaatimukset
3. Liittyvät standardit
|