|
+Article 12 7. |
Article 12 7.Priority dispatch shall not endanger the secure operation of the electricity system, shall not be used as a justification for curtailment of cross-zonal capacities beyond what is provided for in Article 16 and shall be based on transparent and non-discriminatory criteria.
1. Ülevaade
1.1 Viited1.2 Tuvastatud nõuded1.3 Seotud standardid2. Tuvastatud nõuded
3. Seotud standardid
|