|
+Article 12 7. |
Article 12 7.Priority dispatch shall not endanger the secure operation of the electricity system, shall not be used as a justification for curtailment of cross-zonal capacities beyond what is provided for in Article 16 and shall be based on transparent and non-discriminatory criteria.
1. Forbhreathnú
1.1 Tagairtí1.2 Ceanglais aitheanta1.3 Caighdeáin ghaolmhara2. Ceanglais aitheanta
3. Caighdeáin ghaolmhara
|