|
+Article 59 5. |
Article 59 5.ACER shall consult the ENTSO for Electricity, the EU DSO entity, and the other relevant stakeholders in regard to the framework guideline, during a period of no less than two months, in an open and transparent manner.
1. Ülevaade
1.1 Viited1.2 Tuvastatud nõuded1.3 Seotud standardid2. Tuvastatud nõuded
3. Seotud standardid
|