|
+Article 59 5. |
Article 59 5.ACER shall consult the ENTSO for Electricity, the EU DSO entity, and the other relevant stakeholders in regard to the framework guideline, during a period of no less than two months, in an open and transparent manner.
1. Panoramica
1.1 Riferimenti1.2 Requisiti identificati1.3 Standard correlati2. Requisiti identificati
3. Standard correlati
|