|
+Article 72 5 |
Article 72 55. ACER shall consult the ENNOH and, where relevant, the ENTSO for Gas, as well as other relevant stakeholders with regard to the framework guidelines, for a period of no less than two months, in an open and transparent manner. 1. Ülevaade
1.1 Viited1.2 Tuvastatud nõuded1.3 Seotud standardid2. Tuvastatud nõuded
3. Seotud standardid
|