+Article 72 5

Article 72 5

5.   ACER shall consult the ENNOH and, where relevant, the ENTSO for Gas, as well as other relevant stakeholders with regard to the framework guidelines, for a period of no less than two months, in an open and transparent manner.

1. Forbhreathnú

,
Teideal Rialáil

1.1 Tagairtí

1.2 Ceanglais aitheanta

1.3 Caighdeáin ghaolmhara

2. Ceanglais aitheanta

Ceanglais
Foinse Ceanglas

3. Caighdeáin ghaolmhara

Caighdeáin
Foinse Ceanglas