+1. For all aboveground and underground components, excluding distribution and transmission networks …

1. For all aboveground and underground components, excluding distribution and transmission networks …

1.

For all aboveground and underground components, excluding distribution and transmission networks LDAR surveys shall be carried out at the following minimum frequency:

Type of LDAR survey

Type of component

Frequency

Type 1 LDAR survey

Compressor station

Underground storage

LNG facility

Regulating and metering station

4 months

 

Valve station

9 months

Type 2 LDAR survey

Compressor station

Underground storage

LNG facility

Regulating and metering station

8 months

 

Valve station

18 months

Type of LDAR survey

Type of material

Frequency

Type 1 LDAR survey

Bitumen sheet

Grey cast iron

3 months

 

Asbestos

Ductile cast iron

6 months

 

Non-protected steel

Copper

9 months

 

Polyethylene

PVC

Protected steel

15 months

Type 2 LDAR survey

Bitumen sheet

Grey cast iron

6 months

 

Asbestos

Ductile cast iron

12 months

 

Non-protected steel

Polyethylene

PVC

Copper

18 months

 

Protected steel

30 months

Where the type of material cannot be determined, the highest frequency for the respective type of LDAR survey shall be used.

1. Ülevaade

,
Pealkiri Regulatsioon

1.1 Viited

1.2 Tuvastatud nõuded

1.3 Seotud standardid

2. Tuvastatud nõuded

Nõuded
Allikas Nõue

3. Seotud standardid

Standardid
Allikas Nõue