+1. For all aboveground and underground components, excluding distribution and transmission networks …
|
1. For all aboveground and underground components, excluding distribution and transmission networks …
|
1.
|
For all aboveground and underground components, excluding distribution and transmission networks LDAR surveys shall be carried out at the following minimum frequency:
|
Type of LDAR survey
|
Type of component
|
Frequency
|
|
Type 1 LDAR survey
|
Compressor station
Underground storage
LNG facility
Regulating and metering station
|
4 months
|
|
|
Valve station
|
9 months
|
|
Type 2 LDAR survey
|
Compressor station
Underground storage
LNG facility
Regulating and metering station
|
8 months
|
|
|
Valve station
|
18 months
|
|
Type of LDAR survey
|
Type of material
|
Frequency
|
|
Type 1 LDAR survey
|
Bitumen sheet
Grey cast iron
|
3 months
|
|
|
Asbestos
Ductile cast iron
|
6 months
|
|
|
Non-protected steel
Copper
|
9 months
|
|
|
Polyethylene
PVC
Protected steel
|
15 months
|
|
Type 2 LDAR survey
|
Bitumen sheet
Grey cast iron
|
6 months
|
|
|
Asbestos
Ductile cast iron
|
12 months
|
|
|
Non-protected steel
Polyethylene
PVC
Copper
|
18 months
|
|
|
Protected steel
|
30 months
|
Where the type of material cannot be determined, the highest frequency for the respective type of LDAR survey shall be used.
|