|
+Article 27d 4. |
Article 27d 4.The operator shall make its transformation plan, updates of the transformation plan, as well as the results of the assessment referred to in paragraphs 1 and 2 public, as part of the publication of relevant information set out in the EMS as referred to in Article 14a(4).
1. Yleiskatsaus
1.1 Viittaukset1.2 Tunnistetut vaatimukset1.3 Liittyvät standardit2. Tunnistetut vaatimukset
3. Liittyvät standardit
|