+Article 27d 4.

Article 27d 4.

The operator shall make its transformation plan, updates of the transformation plan, as well as the results of the assessment referred to in paragraphs 1 and 2 public, as part of the publication of relevant information set out in the EMS as referred to in Article 14a(4).

1. Panoramica

,
Titolo Regolamentazione

1.1 Riferimenti

1.2 Requisiti identificati

1.3 Standard correlati

2. Requisiti identificati

Requisiti
Fonte Requisito

3. Standard correlati

Standard
Fonte Requisito