+Article 17 1.
|
Article 17 1.
Transmission system operators shall recalculate available cross-zonal capacity at least after day-ahead gate closure times and after intraday cross-zonal gate closure times. Transmission system operators shall allocate the available cross-zonal capacity plus any remaining cross-zonal capacity not previously allocated and any cross-zonal capacity released by physical transmission right holders from previous allocations in the following cross-zonal capacity allocation process.
1. Yleiskatsaus
1.1 Viittaukset
1.2 Tunnistetut vaatimukset
1.3 Liittyvät standardit
2. Tunnistetut vaatimukset
Vaatimukset
| Lähde |
Vaatimus |
3. Liittyvät standardit
Standardit
| Lähde |
Vaatimus |
|