+Article 17 1.

Article 17 1.

Transmission system operators shall recalculate available cross-zonal capacity at least after day-ahead gate closure times and after intraday cross-zonal gate closure times. Transmission system operators shall allocate the available cross-zonal capacity plus any remaining cross-zonal capacity not previously allocated and any cross-zonal capacity released by physical transmission right holders from previous allocations in the following cross-zonal capacity allocation process.

1. Prehľad

,
Názov Regulácia

1.1 Odkazy

1.2 Identifikované požiadavky

1.3 Súvisiace štandardy

2. Identifikované požiadavky

Požiadavky
Zdroj Požiadavka

3. Súvisiace štandardy

Štandardy