+Article 17 1.
|
Article 17 1.
Transmission system operators shall recalculate available cross-zonal capacity at least after day-ahead gate closure times and after intraday cross-zonal gate closure times. Transmission system operators shall allocate the available cross-zonal capacity plus any remaining cross-zonal capacity not previously allocated and any cross-zonal capacity released by physical transmission right holders from previous allocations in the following cross-zonal capacity allocation process.
1. Prehľad
1.1 Odkazy
1.2 Identifikované požiadavky
1.3 Súvisiace štandardy
2. Identifikované požiadavky
Požiadavky
| Zdroj |
Požiadavka |
3. Súvisiace štandardy
Štandardy
| Zdroj |
Požiadavka |
|