+Article 4 1.

Article 4 1.

A project of common interest shall meet the following general criteria:

(a) 

the project is necessary for at least one of the energy infrastructure priority corridors and areas set out in Annex I;

(b) 

the potential overall benefits of the project, assessed in accordance with the relevant specific criteria in paragraph 3, outweigh its costs, including in the longer term;

(c) 

the project meets any of the following criteria:

(i) 

it involves at least two Member States by directly or indirectly, via interconnection with a third country, crossing the border of two or more Member States;

(ii) 

it is located on the territory of one Member State, either inland or offshore, including islands, and has a significant cross-border impact as set out in point (1) of Annex IV.