|
+Article 62 3. |
Article 62 3.The responsibility for adopting internal control standards and putting in place internal control systems and procedures suitable for performing the tasks of the internal auditor shall lie with the Board in its plenary session.
1. Vue d’ensemble
1.1 Références1.2 Exigences identifiées1.3 Normes associées2. Exigences identifiées
3. Normes associées
|