+Article 24 1.
|
Article 24 1.
Member States shall ensure that any waste facility which has been granted a permit or which is already in operation on 1 May 2008 complies with the provisions of this Directive by 1 May 2012, except for those set out in Article 14(1) for which compliance must be ensured by 1 May 2014 and for those set out in Article 13(6) for which compliance must be ensured in accordance with the timetable laid down therein.
1. Vue d’ensemble
| Intitulé |
Réglementation |
,
1.1 Références
1.2 Exigences identifiées
1.3 Normes associées
2. Exigences identifiées
Exigences
| Source |
Exigence |
3. Normes associées
|