+Article 24 1.

Article 24 1.

Member States shall ensure that any waste facility which has been granted a permit or which is already in operation on 1 May 2008 complies with the provisions of this Directive by 1 May 2012, except for those set out in Article 14(1) for which compliance must be ensured by 1 May 2014 and for those set out in Article 13(6) for which compliance must be ensured in accordance with the timetable laid down therein.

1. Visão geral

,
Título Regulamentação

1.1 Referências

1.2 Requisitos identificados

1.3 Normas relacionadas

2. Requisitos identificados

Requisitos
Fonte Requisito

3. Normas relacionadas

Normas
Fonte Requisito