+Article 51 5.

Article 51 5.

The regulatory authority shall examine whether the ten-year network development plan covers all investment needs identified during the consultation process, and whether it is consistent with the non-binding Union-wide ten-year network development plan (‘Union-wide network development plan’) referred to in point (b) of Article 30(1) of Regulation (EU) 2019/943. If any doubt arises as to the consistency with the Union-wide network development plan, the regulatory authority shall consult ACER. The regulatory authority may require the transmission system operator to amend its ten-year network development plan.

The competent national authorities shall examine the consistency of the ten-year network development plan with the national energy and climate plan submitted in accordance with Regulation (EU) 2018/1999.

1. Vue d’ensemble

,
Intitulé Réglementation

1.1 Références

1.2 Exigences identifiées

1.3 Normes associées

2. Exigences identifiées

Exigences
Source Exigence

3. Normes associées

Normes
Source Exigence