Article 51 5.
The regulatory authority shall examine whether the ten-year network development plan covers all investment needs identified during the consultation process, and whether it is consistent with the non-binding Union-wide ten-year network development plan (‘Union-wide network development plan’) referred to in point (b) of Article 30(1) of Regulation (EU) 2019/943. If any doubt arises as to the consistency with the Union-wide network development plan, the regulatory authority shall consult ACER. The regulatory authority may require the transmission system operator to amend its ten-year network development plan. The competent national authorities shall examine the consistency of the ten-year network development plan with the national energy and climate plan submitted in accordance with Regulation (EU) 2018/1999.
1. Apžvalga
| Pavadinimas |
Reguliavimas |
,
1.1 Nuorodos
1.2 Nustatyti reikalavimai
1.3 Susiję standartai
2. Nustatyti reikalavimai
Reikalavimai
| Šaltinis |
Reikalavimas |
3. Susiję standartai
Standartai
| Šaltinis |
Reikalavimas |
|