+Article 12 4.
|
Article 12 4.
Member States shall encourage owners and operators of data centres in their territory with a power demand of the installed IT equal to or greater than 1 MW to take into account the best practices referred to in the most recent version of the European Code of Conduct on Data Centre Energy Efficiency.
1. Vue d’ensemble
| Intitulé |
Réglementation |
,
1.1 Références
1.2 Exigences identifiées
1.3 Normes associées
2. Exigences identifiées
Exigences
| Source |
Exigence |
3. Normes associées
|