+Article 12 4.

Article 12 4.

Member States shall encourage owners and operators of data centres in their territory with a power demand of the installed IT equal to or greater than 1 MW to take into account the best practices referred to in the most recent version of the European Code of Conduct on Data Centre Energy Efficiency.

1. Panoramica

,
Titolo Regolamentazione

1.1 Riferimenti

1.2 Requisiti identificati

1.3 Standard correlati

2. Requisiti identificati

Requisiti
Fonte Requisito

3. Standard correlati

Standard
Fonte Requisito