+Article 8 6

Article 8 6

6.   Contractual limits on the required minimum size of LNG facility or hydrogen terminal capacity and natural gas or hydrogen storage capacity shall be justified on the basis of technical constraints and shall allow smaller storage users to obtain access to storage services.

1. Vue d’ensemble

,
Intitulé Réglementation

1.1 Références

1.2 Exigences identifiées

1.3 Normes associées

2. Exigences identifiées

Exigences
Source Exigence

3. Normes associées

Normes
Source Exigence