+1. At all relevant points, hydrogen network operators shall publish the information as listed in …

1. At all relevant points, hydrogen network operators shall publish the information as listed in …

1.

At all relevant points, hydrogen network operators shall publish the information as listed in the second subparagraph, points (a) to (g), for all services on a numerical basis, in hourly or daily periods.

The following information and its updates shall be published in near real time:

(a)

the technical capacity for flows in both directions;

(b)

the total contracted capacity in both directions;

(c)

the nominations and re-nominations in both directions;

(d)

the available capacity in both directions;

(e)

actual physical flows;

(f)

planned and actual interruption of capacity;

(g)

planned and unplanned interruptions to services; planned interruptions shall be published at least 42 days in advance.

1. Vue d’ensemble

,
Intitulé Réglementation

1.1 Références

1.2 Exigences identifiées

1.3 Normes associées

2. Exigences identifiées

Exigences
Source Exigence

3. Normes associées

Normes
Source Exigence