+1. At all relevant points, hydrogen network operators shall publish the information as listed in …
|
1. At all relevant points, hydrogen network operators shall publish the information as listed in …
|
1.
|
At all relevant points, hydrogen network operators shall publish the information as listed in the second subparagraph, points (a) to (g), for all services on a numerical basis, in hourly or daily periods.
The following information and its updates shall be published in near real time:
|
(a)
|
the technical capacity for flows in both directions;
|
|
(b)
|
the total contracted capacity in both directions;
|
|
(c)
|
the nominations and re-nominations in both directions;
|
|
(d)
|
the available capacity in both directions;
|
|
(e)
|
actual physical flows;
|
|
(f)
|
planned and actual interruption of capacity;
|
|
(g)
|
planned and unplanned interruptions to services; planned interruptions shall be published at least 42 days in advance.
|
|
1. Overzicht
1.1 Referenties
1.2 Geïdentificeerde eisen
1.3 Gerelateerde standaarden
2. Geïdentificeerde eisen
3. Gerelateerde standaarden
|