+INF.14.A2 Defining Commissioning and Interface Management for BACS (B)

INF.14.A2 Defining Commissioning and Interface Management for BACS (B)

Due to the large number of building services systems and building components that are connected in BACS, the commissioning procedure for the building services systems and BACS-relevant components involved MUST be coordinated and defined across the multiple areas at hand. This process MUST be implemented in a coordinated manner to ensure a fully functional building.

Clear interfaces MUST also be defined between the operator organisations of the BACS and the BACS-relevant components, as well as between the operator organisations of the building services systems.

Commissioning and interface management MUST be documented. The specifications MUST be checked and readjusted both regularly and whenever required. In particular, the specifications must be adapted in case of changes within the BACS.

1. Forbhreathnú

Teideal Caighdeán

1.1 Tagairtí

1.2 Ceanglais aitheanta

1.3 Rialacháin ghaolmhara

2. Ceanglais aitheanta

Ceanglais
Foinse Ceanglas

3. Rialacháin ghaolmhara

Rialacháin
Foinse Rialáil

Saincheisteanna nasctha

Naisc
Cineál naisc Saincheist
blocks G 0.18 Poor Planning or Lack of Adaptation