+Article 9 1.
|
Article 9 1.
the development of the first flood hazard maps and flood risk maps and their subsequent reviews as referred to in Articles 6 and 14 of this Directive shall be carried out in such a way that the information they contain is consistent with relevant information presented according to Directive 2000/60/EC. They shall be coordinated with, and may be integrated into, the reviews provided for in Article 5(2) of Directive 2000/60/EC;
1. Forbhreathnú
1.1 Tagairtí
1.2 Ceanglais aitheanta
1.3 Caighdeáin ghaolmhara
2. Ceanglais aitheanta
Ceanglais
| Foinse |
Ceanglas |
3. Caighdeáin ghaolmhara
Caighdeáin
| Foinse |
Ceanglas |
|