+Article 9 1.

Article 9 1.

the development of the first flood hazard maps and flood risk maps and their subsequent reviews as referred to in Articles 6 and 14 of this Directive shall be carried out in such a way that the information they contain is consistent with relevant information presented according to Directive 2000/60/EC. They shall be coordinated with, and may be integrated into, the reviews provided for in Article 5(2) of Directive 2000/60/EC;

1. Panoramica

,
Titolo Regolamentazione

1.1 Riferimenti

1.2 Requisiti identificati

1.3 Standard correlati

2. Requisiti identificati

Requisiti
Fonte Requisito

3. Standard correlati

Standard
Fonte Requisito