+Article 17 1

Article 17 1

1.   As soon as possible and in any event three months after the end of an electricity crisis, the competent authority of the Member State that declared the electricity crisis shall provide the ECG and the Commission with an ex post evaluation report, after having consulted the regulatory authority, where the regulatory authority is not the competent authority.

1. Forbhreathnú

,
Teideal Rialáil

1.1 Tagairtí

1.2 Ceanglais aitheanta

1.3 Caighdeáin ghaolmhara

2. Ceanglais aitheanta

Ceanglais
Foinse Ceanglas

3. Caighdeáin ghaolmhara

Caighdeáin
Foinse Ceanglas