|
+Article 17 1 |
Article 17 11. As soon as possible and in any event three months after the end of an electricity crisis, the competent authority of the Member State that declared the electricity crisis shall provide the ECG and the Commission with an ex post evaluation report, after having consulted the regulatory authority, where the regulatory authority is not the competent authority. 1. Prehľad
1.1 Odkazy1.2 Identifikované požiadavky1.3 Súvisiace štandardy2. Identifikované požiadavky
3. Súvisiace štandardy
|