+Article 71 14

Article 71 14

14.   Where the Commission proposes to adopt a network code on its own initiative as referred to in paragraph 13, the Commission shall consult ACER, the ENTSO for Gas and all relevant stakeholders with regard to the draft network code for a period of no less than two months.

1. Forbhreathnú

,
Teideal Rialáil

1.1 Tagairtí

1.2 Ceanglais aitheanta

1.3 Caighdeáin ghaolmhara

2. Ceanglais aitheanta

Ceanglais
Foinse Ceanglas

3. Caighdeáin ghaolmhara

Caighdeáin
Foinse Ceanglas