+Article 48 5.

Article 48 5.

A CSD that uses an indirect link or an intermediary to operate a CSD link with another CSD shall measure, monitor, and manage the additional risks arising from the use of that indirect link or intermediary and take appropriate measures to mitigate them.

1. Pregled

,
Naslov Regulativa

1.1 Reference

1.2 Utvrđeni zahtjevi

1.3 Povezani standardi

2. Utvrđeni zahtjevi

Zahtjevi
Izvor Zahtjev

3. Povezani standardi

Standardi
Izvor Zahtjev