+DER.2.3.A6 Returning to Production Operations (B)
|
DER.2.3.A6 Returning to Production Operations (B)
After the affected network has been cleaned successfully, the IT systems MUST be returned to production operations in a controlled manner. In so doing, all the previously used IT systems and installed programs that were used to observe and analyse the attack MUST either be removed or incorporated into the productive environment. The same MUST be done with communication and collaboration systems procured for the purpose of cleaning. Evidence and decommissioned IT systems MUST either be deleted or destroyed securely, or archived appropriately.
1. Panoramica
1.1 Riferimenti
1.2 Requisiti identificati
1.3 Regolamentazioni correlate
2. Requisiti identificati
Requisiti
| Fonte |
Requisito |
3. Regolamentazioni correlate
Regolamentazioni
| Fonte |
Regolamentazione |
Ticket collegati
|