+Article 8 1.
|
Article 8 1.
Before the reports referred to in Articles 10 and 11 are issued, an engagement quality control review (in this Article hereinafter referred to as: review) shall be performed to assess whether the statutory auditor or the key audit partner could reasonably have come to the opinion and conclusions expressed in the draft of these reports.
1. Panoramica
| Titolo |
Regolamentazione |
,
1.1 Riferimenti
1.2 Requisiti identificati
1.3 Standard correlati
2. Requisiti identificati
Requisiti
| Fonte |
Requisito |
3. Standard correlati
|