|
+Article 40 3. |
Article 40 3.On the basis of the examination under paragraph 1, the Agency shall draft one of the following decisions and that decision shall be taken in accordance with the procedure laid down in Articles 50 and 51:
(a)
a decision requiring the registrant(s) or downstream user(s) concerned to carry out the proposed test and setting a deadline for submission of the study summary, or the robust study summary if required by Annex I;
(b)
a decision in accordance with point (a), but modifying the conditions under which the test is to be carried out;
(c)
a decision in accordance with points (a), (b) or (d) but requiring registrant(s) or downstream user(s) to carry out one or more additional tests in cases of non-compliance of the testing proposal with Annexes IX, X and XI;
(d)
a decision rejecting the testing proposal;
(e)
a decision in accordance with points (a), (b) or (c), if several registrants or downstream users of the same substance have submitted proposals for the same test, giving them the opportunity to reach an agreement on who will perform the test on behalf of all of them and to inform the Agency accordingly within 90 days. If the Agency is not informed of such agreement within such 90 days, it shall designate one of the registrants or downstream users, as appropriate, to perform the test on behalf of all of them. 1. Panoramica
1.1 Riferimenti1.2 Requisiti identificati1.3 Standard correlati2. Requisiti identificati
3. Standard correlati
|