+Article 47 1.

Article 47 1.

Without prejudice to the decisions of the Supervisory Body under Article 49, the transmission system operator shall have:

(a) 

effective decision-making rights, independent from the vertically integrated undertaking, with respect to assets necessary to operate, maintain or develop the transmission system; and

(b) 

the power to raise money on the capital market in particular through borrowing and capital increase.

1. Panoramica

,
Titolo Regolamentazione

1.1 Riferimenti

1.2 Requisiti identificati

1.3 Standard correlati

2. Requisiti identificati

Requisiti
Fonte Requisito

3. Standard correlati

Standard
Fonte Requisito