+Article 26 Network Performance Plan
---+Article 26 1
---+Article 26 2
---+Article 26 3
---+Article 26 4

Article 26 Network Performance Plan

1. Panoramica

,
Titolo Regolamentazione
Article 26 1

1.   The Network Manager shall, for each reference period, draw up, in accordance with the cooperative decision-making process referred to in Article 38(11), a draft Network Performance Plan.

The draft Network Performance Plan shall be drawn up after the setting of Union-wide performance targets and before the start of the reference period concerned. It shall contain performance targets in the key performance areas referred to in Article 21(3), point (a).

Article 26 2

2.   The draft Network Performance Plan shall be submitted to the Commission for assessment and adoption.

Article 26 3

3.   The Commission shall assess the draft Network Performance Plan based on the following essential criteria:

(a)

consideration of performance improvements over time, for the reference period covered by the performance plan, and for the timeframe comprising both the preceding reference period and the reference period covered by the performance plan as well as contribution towards Union-wide performance targets;

(b)

completeness and consistency of the draft Network Performance Plan in terms of data and supporting materials, including key assumptions applied and traffic forecasts.

Article 26 4

4.   Where the Commission finds that the draft Network Performance Plan is complete and shows adequate performance improvements, it shall adopt the draft Network Performance Plan as a definitive plan. Otherwise, the Commission shall request the Network Manager to submit a revised draft Network Performance Plan.