+Article 26 3

Article 26 3

3.   The Commission shall assess the draft Network Performance Plan based on the following essential criteria:

(a)

consideration of performance improvements over time, for the reference period covered by the performance plan, and for the timeframe comprising both the preceding reference period and the reference period covered by the performance plan as well as contribution towards Union-wide performance targets;

(b)

completeness and consistency of the draft Network Performance Plan in terms of data and supporting materials, including key assumptions applied and traffic forecasts.

1. Panoramica

,
Titolo Regolamentazione

1.1 Riferimenti

1.2 Requisiti identificati

1.3 Standard correlati

2. Requisiti identificati

Requisiti
Fonte Requisito

3. Standard correlati

Standard
Fonte Requisito