Buildings normally house a number of basic supply and disposal networks that therefore serve as a foundation for all business processes in an organisation, including its IT. Examples of such supply networks include the following:

Amongst other things, the failure or malfunction of a supply network can mean that people can no longer work in the building or that IT operations and thus information processing are impaired.

The networks are mutually dependent to varying degrees, which means that operational disruptions in any of the individual networks will also affect the other networks.

Examples:

Susietos užduotys

Saitai
Saito tipas Užduotis
is blocked by IND.2.1.A7 Creating Backups [OT Operations] (S)
is blocked by INF.1.A1 Planning the Building Protection [Planner] (B)
is blocked by INF.1.A13 Regulations Governing Access to Distributors (S)
is blocked by INF.1.A14 Lightning Protection Devices (S)
is blocked by INF.1.A15 Plans Detailing the Location of Supply Lines (S)
is blocked by INF.1.A36 Regular Documentation Updates (S)
is blocked by INF.1.A25 Selection of Appropriate Locations [Top Management] (A)
is blocked by INF.1.A30 Selection of an Appropriate Building (H)
is blocked by INF.2.A2 Formation of Fire Zones [Planner] (B)
is blocked by INF.2.A8 Use of a Fire Alarm System [Planner] (B)
is blocked by INF.2.A9 Use of an Extinguishing or Fire Prevention System [Building Services] (B)
is blocked by INF.2.A10 Inspection and Maintenance of Infrastructure [Maintenance Personnel, Building Services] (B)
is blocked by INF.2.A11 Automatic Monitoring of Infrastructure [Building Services] (B)
is blocked by INF.2.A17 Use of Early Fire Detection [Planner, Building Services] (B)
is blocked by INF.2.A13 Planning and Installation of Alarm Systems [Building Services] (S)
is blocked by INF.2.A19 Functional Testing of Technical Infrastructure [Building Services] (S)
is blocked by INF.2.A30 Systems for Extinguishing or Preventing Fires [Building Services, Planner] (S)
is blocked by INF.2.A21 Alternate Data Centre (H)
is blocked by INF.2.A23 Appropriate Design of Data Centre Cabling [Building Services] (H)
is blocked by INF.2.A28 Use of Higher-Level Alarm Systems [Planner] (H)
is blocked by INF.5.A4 Protection Against Intrusion [Planner, Building Services] (B)
is blocked by INF.5.A6 Minimising Fire Loads [Employee, Planner] (B)
is blocked by INF.5.A11 Avoidance of Pipes with Hazardous Liquids and Gases [Planner, Building Services] (S)
is blocked by INF.5.A12 Protection Against Accidental Damage to Supply Lines [Planner] (S)
is blocked by INF.5.A14 Minimising Fire Hazards from Neighbouring Areas [Planner, Building Services] (S)
is blocked by INF.5.A15 Lightning and Overvoltage Protection [Planner, Building Services] (S)
is blocked by INF.5.A16 Use of an Uninterruptible Power Supply [Building Services] (S)
is blocked by INF.5.A17 Inspection and Maintenance of Infrastructure [Building Services, IT Operation Department, Maintenance Personnel] (S)
is blocked by INF.5.A19 Redundancy of the Technical Infrastructure Room [Planner] (H)
is blocked by INF.5.A20 Enhanced Protection Against Intrusion and Sabotage [Planner] (H)
is blocked by INF.5.A22 Redundant Power Supply Design [Planner] (H)
is blocked by INF.5.A23 Emergency Power Systems [Planner, Building Services, Maintenance Personnel] (H)
is blocked by INF.5.A24 Ventilation and Cooling [Planner, Building Services, Maintenance Personnel] (H)
is blocked by INF.5.A25 Increased Protection Against Fire and Smoke Damage [Planner] (H)
is blocked by INF.5.A26 Monitoring of the Power Supply [Planner, Building Services] (H)
is blocked by INF.13.A6 Drawing Up a TBM Concept (S) [Planner]
is blocked by INF.13.A17 Provisions for Maintenance and Repairs in TBM (S)
is blocked by INF.13.A18 Proactive Maintenance in TBM (S) [Planner]
is blocked by INF.13.A22 Performing System Tests in TBM (S) [Planner]
is blocked by INF.13.A25 Establishment of a Test Environment for TBM (H) [Planner]
is blocked by INF.14.A3 Secure Connection of Building Services and Building Services Systems (B)
is blocked by INF.14.A10 Formation of Independent BACS Areas (S) [Planner]