If organisational procedures that are used directly or indirectly for information processing are not designed properly, security problems may arise. Although each individual process step is carried out correctly, damage is often caused because processes are incorrectly defined in their entirety.

Another possible cause for security problems is dependencies with other processes which are not obviously related to information processing themselves. These dependencies may be easily overlooked during the planning phase and thus cause impairments during operations.

Moreover, there may be security problems when tasks, roles or responsibilities are not clearly assigned. Amongst other things, this may result in procedures being delayed, security safeguards neglected or rules disregarded.

There is also a risk if devices, products, procedures or other means are not used properly to realise information processing. The selection of an unsuitable product or vulnerabilities, for example in the application architecture or in the network design, may lead to security problems.

Examples:

Information technology and the entire environment of a public authority or company are constantly changing. Such changes can include the addition or relocation of an employee, the purchasing of new hardware or software, or a company supplying operating resources declaring bankruptcy. Threats can result from not taking necessary organisational and technical adjustments into consideration, or only doing so to an insufficient extent.

Examples:

Susietos užduotys

Saitai
Saito tipas Užduotis
is blocked by ISMS.1.A1 Acceptance of Overall Responsibility for Information Security by Top Management [Top Management] (B)
is blocked by ISMS.1.A2 Defining Security Objectives and Strategy [Top Management] (B)
is blocked by ISMS.1.A3 Drawing Up an Information Security Policy [Top Management] (B)
is blocked by ISMS.1.A4 Appointment of a Chief Information Security Officer [Top Management] (B)
is blocked by ISMS.1.A5 Contract Design When Appointing an External Chief Information Security Officer [Top Management] (B)
is blocked by ISMS.1.A6 Establishment of a Suitable Organisational Structure for Information Security [Top Management] (B)
is blocked by ISMS.1.A7 Definition of Security Safeguards (B)
is blocked by ISMS.1.A8 Integration of Employees into the Security Process [Supervisor] (B)
is blocked by ISMS.1.A9 Integrating Information Security into Organisation-Wide Procedures and Processes [Top Management] (B)
is blocked by ISMS.1.A10 Drawing Up a Security Concept (S)
is blocked by ISMS.1.A11 Continuity of Information Security (S)
is blocked by ISMS.1.A13 Documentation of the Security Process (S)
is blocked by ISMS.1.A15 Cost-Effective Use of Resources for Information Security (S)
is blocked by ISMS.1.A16 Creating Target-Group-Orientated Security Policies (H)
is blocked by ISMS.1.A17 Taking Out Insurance (H)
is blocked by ORP.1.A1 Specification of Responsibilities and Provisions [Top Management]
is blocked by ORP.1.A2 Assigning Responsibilities [Top Management] (B)
is blocked by ORP.1.A8 Managing Resources and Devices [IT Operation Department] (S)
is blocked by ORP.1.A13 Security During Relocation [IT Operation Department, Building Services] (S)
is blocked by ORP.1.A16 Policy for Secure IT Use [User] (S)
is blocked by ORP.4.A1 Regulation for Creating and Deleting Users and User Groups [IT Operation Department] (B)
is blocked by ORP.4.A2 Creating, Changing, and Revoking Authorisations [IT Operation Department] (B)
is blocked by ORP.4.A3 Documentation of User IDs and Rights Profiles [IT Operation Department] (B)
is blocked by ORP.4.A5 Assignment of Site Access Rights [IT Operation Department] (B)
is blocked by ORP.4.A6 Assignment of System Access Rights [IT Operation Department] (B)
is blocked by ORP.4.A7 Assignment of Data Access Rights [IT Operation Department] (B)
is blocked by ORP.4.A8 Provisions Governing the Use of Passwords [User, IT Operation Department] (B)
is blocked by ORP.4.A9 Identification and Authentication [IT Operation Department] (B)
is blocked by ORP.4.A22 Regulating Password Quality [IT Operation Department] (B)
is blocked by ORP.4.A23 Regulating Password-Processing Applications and IT Systems [IT Operation Department] (B)
is blocked by ORP.4.A11 Resetting Passwords [IT Operation Department] (S)
is blocked by ORP.4.A14 Checking the Effectiveness of User Separation in IT Systems or Applications [IT Operation Department] (S)
is blocked by ORP.4.A15 Approach and Design of Identity and Access Management Processes [IT Operation Department] (S)
is blocked by ORP.4.A16 Policies for Data and System Access Control [IT Operation Department] (S)
is blocked by ORP.4.A17 Suitable Selection of Identity and Access Management Systems [IT Operation Department] (S)
is blocked by ORP.4.A18 Using a Central Authentication Service [IT Operation Department] (S)
is blocked by CON.1.A1 Selecting Appropriate Cryptographic Methods [Process Owner]
is blocked by CON.1.A2 Backups When Using Cryptographic Methods [IT Operation Department] (B)
is blocked by CON.1.A4 Appropriate Key Management (S)
is blocked by CON.1.A6 Identifying the Need for Cryptographic Methods and Products [IT Operation Department, Process Owner] (S)
is blocked by CON.1.A7 Drawing Up a Security Policy for the Use of Cryptographic Methods and Products (H)
is blocked by CON.1.A8 Determining the Factors That Influence Cryptographic Methods and Products (H)
is blocked by CON.1.A9 Selecting an Appropriate Cryptographic Product [IT Operation Department, Process Owner] (H)
is blocked by CON.1.A10 Developing a Crypto Concept (H)
is blocked by CON.1.A12 Secure Separation of Roles When Using Crypto Modules [IT Operation Department] (H)
is blocked by CON.1.A13 Operating System Security Requirements When Using Crypto Modules (H)
is blocked by CON.1.A15 Reacting to the Practical Weakening of a Crypto Method (H)
is blocked by CON.2.A1 Implementing the German Standard Data Protection Model (B)
is blocked by CON.3.A1 Determining the Factors That Influence Backups [Process Owner, IT Operation Department] (B)
is blocked by CON.3.A2 Establishment of Backup Procedures [Process Owner, IT Operation Department] (B)
is blocked by CON.3.A4 Creating Backup Plans [IT Operation Department] (B)
is blocked by CON.3.A5 Regular Backups [IT Operation Department] (B)
is blocked by CON.3.A15 Regular Backup Testing [IT Operation Department] (B)
is blocked by CON.3.A6 Developing a Backup Concept [Process Owner, IT Operation Department] (S)
is blocked by CON.3.A7 Procuring a Suitable Backup System [IT Operation Department] (S)
is blocked by CON.3.A9 Prerequisites of Online Backups [IT Operation Department] (S)
is blocked by CON.3.A13 Using Cryptographic Methods for Backups [IT Operation Department] (H)
is blocked by CON.6.A1 Regulations for Deleting or Destroying Information [Central Administration, Process Owner, Data Protection Officer, IT Operation Department] (B)
is blocked by CON.6.A11 Deletion and Destruction of Storage Media by External Service Providers (B)
is blocked by CON.6.A4 Selecting Suitable Methods for Deleting or Destroying Storage Media (S)
is blocked by CON.6.A8 Creating a Policy for Deleting and Destroying Information [Employee, IT Operation Department, Data Protection Officer] (S)
is blocked by CON.7.A1 Security Policy for Information Security on Trips Abroad
is blocked by CON.7.A2 Raising Employee Awareness of Information Security When Travelling Abroad (B)
is blocked by CON.7.A3 Identification of Country-Specific Regulations, Travel Conditions and Environmental Conditions [Human Resource Department]
is blocked by CON.7.A8 Secure Use of Public WLANs [User] (B)
is blocked by CON.7.A10 Encryption of Portable IT Systems and Storage Media [User, IT Operation Department] (B)
is blocked by CON.7.A12 Secure Destruction of Sensitive Materials and Documents [User] (B)
is blocked by CON.7.A13 Transporting Necessary Data and Storage Media [User] (S)
is blocked by CON.7.A17 Use of Dedicated Travel Hardware [IT Operation Department] (H)
is blocked by CON.7.A18 Restricted Authorisations on Trips Abroad [IT Operation Department] (H)
is blocked by CON.8.A2 Selection of a Process Model (B)
is blocked by CON.8.A3 Selection of a Development Environment (B)
is blocked by CON.8.A5 Secure System Design (B)
is blocked by CON.8.A1 Definition of Roles and Responsibilities [Central Administration] (S)
is blocked by CON.8.A16 Appropriate Control of Software Development (S)
is blocked by CON.8.A21 Threat Modelling (S)
is blocked by CON.8.A22 Secure Software Design (S)
is blocked by CON.9.A1 Definition of Authorised Recipients [Central Administration, Users] (B)
is blocked by CON.9.A4 Agreements on Exchanging Information with External Parties [Central Administration] (S)
is blocked by CON.10.A10 Restrictive Disclosure of Security-Related Information (B)
is blocked by OPS.1.1.3.A1 Concept for Patch and Change Management [Process Owner] (B)
is blocked by OPS.1.1.3.A2 Definition of Responsibilities (B)
is blocked by OPS.1.1.3.A15 Regular Updating of IT Systems and Software (B)
is blocked by OPS.1.1.3.A5 Handling Change Requests [Process Owner] (S)
is blocked by OPS.1.1.3.A6 Coordination of Change Requests (S)
is blocked by OPS.1.1.3.A7 Integration of Change Management into Business Processes (S)
is blocked by OPS.1.1.3.A11 Continuous Documentation of Information Processing (S)
is blocked by OPS.1.1.3.A12 Use of Tools in Change Management (H)
is blocked by OPS.1.1.3.A13 Measuring the Success of Change Requests [Process Owner] (H)
is blocked by OPS.1.1.3.A14 Synchronisation Within Change Management (H)
is blocked by OPS.1.1.5.A1 Drawing Up a Security Policy for Logging [Process Owner] (B)
is blocked by OPS.1.1.5.A6 Basic Structure of a Centralised Logging Infrastructure (S)
is blocked by OPS.1.1.5.A9 Providing Log Data for Assessment (S)
is blocked by OPS.1.1.6.A1 Planning of Software Tests (B)
is blocked by OPS.1.1.6.A4 Software Approval [Process Owner] (B)
is blocked by OPS.1.1.6.A6 Orderly Instruction of Software Testers [Process Owner] (S)
is blocked by OPS.1.1.6.A7 Selecting Software Testers [Human Resources Department, Process Owner] (S)
is blocked by OPS.1.1.6.A10 Drawing Up an Acceptance Plan (S)
is blocked by OPS.1.1.6.A12 Performing Regression Tests [Tester] (S)
is blocked by OPS.1.1.6.A13 Separating the Test Environment from the Production Environment (S)
is blocked by OPS.1.1.6.A15 Verification of Installation and Related Documentation [Tester] (S)
is blocked by OPS.1.1.6.A14 Performing Penetration Tests [Tester] (H)
is blocked by OPS.1.1.6.A16 Security Vetting of Testers (H)
is blocked by OPS.1.1.7.A1 Specification of System Management Requirements (B)
is blocked by OPS.1.1.7.A2 System Management Planning (B)
is blocked by OPS.1.1.7.A8 Drawing Up a System Management Concept (S)
is blocked by OPS.1.1.7.A10 Concept for Secure Operation of the System Management Solution (S)
is blocked by OPS.1.1.7.A11 Regular Gap Analysis Within the Framework of System Management (S)
is blocked by OPS.1.1.7.A15 Status Monitoring, Logging, and Alerting of Relevant Events in the System Management Solution and the Systems to be Managed (S)
is blocked by OPS.1.1.7.A24 Automated Checking of Security-Relevant Configurations by Suitable Detection Systems (H)
is blocked by OPS.1.2.2.A1 Determining Parameters for Electronic Archiving (B)
is blocked by OPS.1.2.2.A2 Drawing up an Archiving Concept (B)
is blocked by OPS.1.2.2.A4 Consistent Indexing of Data During Archiving [IT Operation Department, User] (B)
is blocked by OPS.1.2.2.A5 Regular Regeneration of Archived Data [IT Operation Department] (B)
is blocked by OPS.1.2.2.A10 Drawing Up a Policy for Using Archive Systems [IT Operation Department] (S)
is blocked by OPS.1.2.2.A13 Regular Auditing of Archiving Processes (S)
is blocked by OPS.1.2.2.A14 Regular Observation of the Market for Archive Systems [IT Operation Department] (S)
is blocked by OPS.1.2.2.A15 Regular Processing of Cryptographically Secured Data During Archiving [IT Operation Department] (S)
is blocked by OPS.1.2.2.A16 Regular Renewal of Technical Archive System Components [IT Operation Department] (S)
is blocked by OPS.1.2.2.A18 Using Appropriate Archive Media [IT Operation Department] (S)
is blocked by OPS.1.2.2.A19 Regular Function and Recovery Tests for Archiving [IT Operation Department] (S)
is blocked by OPS.1.2.4.A1 Rules on Teleworking [Supervisor, Human Resources Department] (B)
is blocked by OPS.1.2.4.A5 Employee Awareness and Training (B)
is blocked by OPS.1.2.4.A6 Creating a Security Concept for Teleworking (S)
is blocked by OPS.1.2.4.A7 Regulations on Using Communication Capabilities for Teleworking [IT Operation Department, Employee] (S)
is blocked by OPS.1.2.4.A8 Flow of Information Between Employees and Organisations [Supervisor, Employee] (S)
is blocked by OPS.1.2.4.A9 Support and Maintenance Concept for Teleworking Locations [IT Operation Department, Employee] (S)
is blocked by OPS.1.2.4.A10 Analysis of Teleworking Location Requirements [IT Operation Department] (S)
is blocked by OPS.1.2.5.A1 Planning the Use of Remote Maintenance (B)
is blocked by OPS.1.2.5.A3 Securing Interfaces for Remote Maintenance (B)
is blocked by OPS.1.2.5.A6 Drawing Up a Policy for Remote Maintenance (S)
is blocked by OPS.1.2.5.A7 Documentation During Remote Maintenance (S)
is blocked by OPS.1.2.5.A9 Selection and Acquisition of Suitable Remote Maintenance Tools (S)
is blocked by OPS.1.2.5.A10 Management of Remote Maintenance Tools (S)
is blocked by OPS.1.2.5.A20 Remote Maintenance Operations (S)
is blocked by OPS.1.2.5.A21 Creation of a Business Continuity Plan in Case of Remote Maintenance Failure (S)
is blocked by OPS.1.2.5.A22 Redundant Communication Links (H)
is blocked by OPS.1.2.6.A1 Planning the Use of NTPs (B)
is blocked by OPS.1.2.6.A6 Monitoring of IT Systems Using NTP (S)
is blocked by OPS.1.2.6.A7 Secure Configuration of NTP Clients (S)
is blocked by OPS.1.2.6.A8 Use of Secure Time Synchronisation Protocols (S)
is blocked by OPS.2.1.A1 Specification of Security Requirements for Outsourcing Projects (B)
is blocked by OPS.2.1.A5 Establishing an Outsourcing Strategy (S)
is blocked by OPS.2.1.A6 Drawing up a Security Concept for the Outsourcing Project [Process Owner] (S)
is blocked by OPS.2.1.A9 Agreements on Connecting to Outsourcing Partner Networks (S)
is blocked by OPS.2.1.A12 Change Management [Process Owner] (S)
is blocked by OPS.2.1.A13 Secure Migration in Outsourcing Projects (S)
is blocked by OPS.2.2.A1 Drawing Up a Strategy for Cloud Usage [Process Owner, Top Management, Data Protection Officer] (B)
is blocked by OPS.2.2.A2 Drawing Up a Security Policy for Cloud Usage [Process Owner] (B)
is blocked by OPS.2.2.A3 Service Definition for Cloud Services by the Customer [Process Owner] (B)
is blocked by OPS.2.2.A4 Definition of Areas of Responsibility and Interfaces [Process Owner] (B)
is blocked by OPS.2.2.A5 Planning a Secure Migration to a Cloud Service [Process Owner] (S)
is blocked by OPS.2.2.A6 Planning the Secure Integration of Cloud Services (S)
is blocked by OPS.2.2.A8 Careful Selection of a Cloud Service Provider [Top Management] (S)
is blocked by OPS.2.2.A9 Contractual Arrangements with the Cloud Service Provider [Top Management] (S)
is blocked by OPS.2.2.A10 Secure Migration to a Cloud Service [Process Owner] (S)
is blocked by OPS.2.2.A12 Maintaining Information Security During Live Cloud Operations (S)
is blocked by OPS.2.2.A13 Evidence of Sufficient Information Security for Cloud Usage (S)
is blocked by OPS.2.2.A14 Orderly Termination of a Cloud Service Relationship [Process Owner, Top Management] (S)
is blocked by OPS.3.1.A1 Drawing Up a Rough Concept for the Outsourcing Service (B)
is blocked by OPS.3.1.A11 Site, System, and Data Access Control [Central Administration] (S)
is blocked by OPS.3.1.A12 Change Management [Organisation] (S)
is blocked by DER.1.A6 Continuous Monitoring and Analysis of Log Data (S)
is blocked by DER.1.A16 Use of Detection Systems in Accordance with Protection Requirements (H)
is blocked by DER.2.1.A1 Definition of a Security Incident (B)
is blocked by DER.2.1.A2 Drawing Up a Policy for Handling Security Incidents (B)
is blocked by DER.2.1.A3 Specification of Responsibilities and Contact Persons in the Event of Security Incidents (B)
is blocked by DER.2.1.A5 Remedial Action in Connection with Security incidents [IT Operation Department] (B)
is blocked by DER.2.1.A6 Recovering the Operating Environment After Security Incidents [IT Operation Department] (B)
is blocked by DER.2.1.A7 Establishment of a Procedure for Handling Security Incidents [Top Management] (S)
is blocked by DER.2.1.A8 Design of Organisational Structures for Handling Security Incidents (S)
is blocked by DER.2.1.A9 Definition of Reporting Paths for Security Incidents (S)
is blocked by DER.2.1.A10 Limiting the Effects of Security Incidents [BCM Officer, IT Operation Department] (S)
is blocked by DER.2.1.A11 Classification of Security Incidents [IT Operation Department] (B)
is blocked by DER.2.1.A12 Specification of Where Security Incident Handling Overlaps with Fault Management [BCM Officer] (S)
is blocked by DER.2.1.A13 Integration into Security and Business Continuity Management [BCM Officer] (S)
is blocked by DER.2.1.A14 Escalation Strategy for Security Incidents [IT Operation Department] (S)
is blocked by DER.2.1.A15 Training Service Desk Employees [IT Operation Department] (S)
is blocked by DER.2.1.A16 Documentation for Remedying Security Incidents (S)
is blocked by DER.2.1.A17 Evaluation of Security Incidents (S)
is blocked by DER.2.1.A18 Further Development of Processes Based on Findings from Security Incidents and Industry Developments [Process Owner] (S)
is blocked by DER.2.1.A19 Specifying Priorities for Handling Security Incidents [Top Management] (H)
is blocked by DER.2.1.A20 Creation of a Dedicated Reporting Office for Security Incidents (H)
is blocked by DER.2.1.A21 Assembling a Team of Experts for Handling Security Incidents (H)
is blocked by DER.2.1.A22 Reviewing Management System Efficiency in Handling Security Incidents (H)
is blocked by DER.2.3.A1 Creation of a Management Committee (B)
is blocked by DER.2.3.A2 Deciding on a Cleaning Strategy (B)
is blocked by DER.2.3.A3 Isolation of Affected Network Segments (B)
is blocked by DER.2.3.A4 Blocking and Changing Access Data and Cryptographic Keys (B)
is blocked by DER.2.3.A5 Closing the Initial Entry Route (B)
is blocked by DER.2.3.A6 Returning to Production Operations (B)
is blocked by DER.2.3.A7 Targeted System Hardening (S)
is blocked by DER.2.3.A8 Establishing Secure, Independent Communication Channels (S)
is blocked by DER.2.3.A9 Hardware Replacement in Affected IT Systems (H)
is blocked by DER.2.3.A10 Modifications to Help Thwart a Repeat Attack (H)
is blocked by DER.3.1.A1 Definition of Responsibilities [Top Management] (B)
is blocked by DER.3.1.A2 Preparing an Audit or Revision (B)
is blocked by DER.3.1.A3 Conducting an Audit [Audit Team] (B)
is blocked by DER.3.1.A4 Performing a Revision (B)
is blocked by DER.3.1.A5 Integration into the Information Security Process (S)
is blocked by DER.3.1.A6 Definition of an Audit and Revision Basis and a Uniform Evaluation Scheme (S)
is blocked by DER.3.1.A7 Drawing Up an Audit Program (S)
is blocked by DER.3.1.A8 Creation of a Revision List (S)
is blocked by DER.3.1.A9 Selection of an Appropriate Audit Team or Revision Team (S)
is blocked by DER.3.1.A10 Creation of a Audit Plan or Revision Plan [Audit Team] (S)
is blocked by DER.3.1.A11 Communication and Behaviour During Audits [Audit Team] (S)
is blocked by DER.3.1.A12 Holding an Initial Meeting [Audit Team] (S)
is blocked by DER.3.1.A13 Inspection and Review of Documents [Audit Team] (S)
is blocked by DER.3.1.A14 Selection of Samples [Audit Team] (S)
is blocked by DER.3.1.A15 Selection of Appropriate Audit Techniques [Audit Team] (S)
is blocked by DER.3.1.A16 Schedule of the On-Site Audit [Audit Team] (S)
is blocked by DER.3.1.A17 Performance of the On-Site Audit [Audit Team] (S)
is blocked by DER.3.1.A18 Conducting Interviews [Audit Team] (S)
is blocked by DER.3.1.A19 Revision of the Risk Treatment Plan [Audit Team] (S)
is blocked by DER.3.1.A20 Holding a Closing Meeting [Audit Team] (S)
is blocked by DER.3.1.A21 Analysis of Audits [Audit Team] (S)
is blocked by DER.3.1.A22 Creation of an Audit Report [Audit Team] (S)
is blocked by DER.3.1.A23 Documentation of Revision Results (S)
is blocked by DER.3.1.A24 Conclusion of the Audit or Revision [Audit Team] (S)
is blocked by DER.3.1.A25 Evaluation of an Audit (S)
is blocked by DER.3.1.A26 Monitoring and Adapting the Audit Program (S)
is blocked by DER.3.1.A27 Storage and Archiving of Documents on Audits and Revisions (S)
is blocked by DER.3.2.A1 Designation of Persons in Charge of the IS Audit [Top Management] (B)
is blocked by DER.3.2.A2 Creation of an IS Audit Manual (B)
is blocked by DER.3.2.A3 Definition of the Audit Basis (B)
is blocked by DER.3.2.A4 Drawing Up a Plan for the IS Audit (B)
is blocked by DER.3.2.A5 Selection of an Appropriate IS Audit Team (B)
is blocked by DER.3.2.A6 Preparation of an IS Audit [IS Audit Team] (B)
is blocked by DER.3.2.A7 Performance of an IS Audit [IS Audit Team] (B)
is blocked by DER.3.2.A8 Storage of IS Audit Reports (B)
is blocked by DER.3.2.A9 Integration into the Information Security Process (S)
is blocked by DER.3.2.A10 Communication Coordination (S)
is blocked by DER.3.2.A11 Holding an Initial Meeting for an IS Cross-Cutting Audit [IS Audit Team] (S)
is blocked by DER.3.2.A12 Creation of a Gap Analysis Plan [IS Audit Team] (S)
is blocked by DER.3.2.A13 Inspection and Review of Documents [IS Audit Team] (S)
is blocked by DER.3.2.A14 Selection of Target Objects and Requirements to Be Audited [IS Audit Team] (S)
is blocked by DER.3.2.A15 Selection of Appropriate Audit Techniques [IS Audit Team] (S)
is blocked by DER.3.2.A16 Creating a Procedure for the On-Site Audit [IS Audit Team] (S)
is blocked by DER.3.2.A17 Conducting the On-Site Audit [IS Audit Team] (S)
is blocked by DER.3.2.A18 Conducting Interviews [IS Audit Team] (S)
is blocked by DER.3.2.A19 Reviewing Risk Treatment Options [IS Audit Team] (S)
is blocked by DER.3.2.A20 Following Up on the On-Site Audit [IS Audit Team] (S)
is blocked by DER.3.2.A21 Creation of an IS Audit Report [IS Audit Team] (S)
is blocked by DER.3.2.A22 Following Up on an IS Audit (S)
is blocked by DER.4.A1 Creating a Business Continuity Plan (S)
is blocked by DER.4.A2 Integration of Business Continuity Management and Information Security Management [Chief Information Security Officer (CISO)] (S)
is blocked by DER.4.A3 Specifying the Scope and the Business Continuity Strategy [Top Management] (H)
is blocked by DER.4.A4 Policy for Business Continuity Management and Acceptance of Overall Responsibility by Top Management [Top Management] (H)
is blocked by DER.4.A5 Establishing a Suitable Organisational Structure for Business Continuity Management [Top Management] (H)
is blocked by DER.4.A6 Providing Adequate Resources for Business Continuity Management [Top Management] (H)
is blocked by DER.4.A7 Creating a Contingency Concept [Top Management] (CIA)
is blocked by DER.4.A8 Integrating Employees into the Business Continuity Management Process [Supervisor, Human Resources Department] (H)
is blocked by DER.4.A9 Integrating Business Continuity Management into Organisation-Wide Procedures and Processes [Top Management] (H)
is blocked by DER.4.A10 Tests and Emergency Drills [Top Management] (H)
is blocked by DER.4.A12 Documentation in the Business Continuity Management Process (H)
is blocked by DER.4.A13 Checking and Controlling the Business Continuity Management System [Top Management] (H)
is blocked by DER.4.A14 Regular Checking and Improvement of Business Continuity Safeguards [Top Management] (H)
is blocked by DER.4.A15 Assessing the Performance of the Business Continuity Management System [Top Management] (H)
is blocked by DER.4.A16 Contingency Planning and Emergency Response Planning for Outsourced Components [Top Management] (H)
is blocked by APP.1.1.A6 Testing New Versions of Office Products (S)
is blocked by APP.1.1.A10 Regulations for Software Development by End Users (S)
is blocked by APP.1.1.A12 No Cloud Storage [User] (S)
is blocked by APP.1.2.A6 Password Management in Web Browsers (B)
is blocked by APP.1.2.A13 Use of DNS over HTTPS (B)
is blocked by APP.1.4.A1 Requirements Analysis for the Use of Apps [Process Owner] (B)
is blocked by APP.1.4.A3 Distributing Sensitive Apps (S)
is blocked by APP.1.4.A12 Secure App Removal (S)
is blocked by APP.1.4.A14 Support for Additional Authentication Features for Apps (H)
is blocked by APP.1.4.A16 Mobile Application Management (H)
is blocked by APP.2.1.A1 Creation of a Security Policy for Directory Services (B)
is blocked by APP.2.1.A2 Planning the Use of Directory Services [Data Protection Officer, Process Owner] (B)
is blocked by APP.2.1.A3 Setting Up Access Authorisations for Directory Services [Process Owner] (B)
is blocked by APP.2.1.A5 Secure Configuration and Configuration Changes in Directory Services (B)
is blocked by APP.2.1.A7 Drawing Up a Security Concept for the Use of Directory Services (S)
is blocked by APP.2.1.A8 Planning of Partitioning and Replication in the Directory Service (S)
is blocked by APP.2.1.A9 Selection of Suitable Components for Directory Services [Process Owner] (S)
is blocked by APP.2.1.A11 Setting Up Access to Directory Services (S)
is blocked by APP.2.1.A12 Monitoring Directory Services (S)
is blocked by APP.2.1.A14 Orderly Decommissioning of a Directory Service [Process Owner] (S)
is blocked by APP.2.1.A15 Migration of Directory Services (S)
is blocked by APP.2.1.A16 Creation of a Business Continuity Plan for Directory Service Failure (H)
is blocked by APP.2.2.A1 Planning Active Directory [Process Owner] (B)
is blocked by APP.2.2.A2 Planning of Active Directory Administration [Process Owner] (B)
is blocked by APP.2.2.A3 Planning of Group Policy in Windows (B)
is blocked by APP.2.2.A7 Implementation of Secure Administration Methods for Active Directory [Process Owner] (B)
is blocked by APP.2.2.A11 Monitoring Active Directory Infrastructure (S)
is blocked by APP.3.1.A1 Authentication (B)
is blocked by APP.3.1.A8 System Architecture [Procurement Department] (S)
is blocked by APP.3.1.A9 Web Application and Web Service Procurement (S)
is blocked by APP.3.1.A22 Penetration Testing and Auditing (S)
is blocked by APP.3.2.A8 Planning the Use of a Web Server (S)
is blocked by APP.3.2.A9 Defining a Web Server Security Policy (S)
is blocked by APP.3.2.A10 Selecting an Appropriate Web Host (S)
is blocked by APP.3.3.A15 Planning File Servers (B)
is blocked by APP.3.3.A6 Acquiring a File Server and Selecting a Service (S)
is blocked by APP.3.4.A1 Planning the Use of a Samba Server (B)
is blocked by APP.3.4.A7 Secure DNS Configuration in Samba (S)
is blocked by APP.3.4.A8 Secure LDAP Configuration in Samba (S)
is blocked by APP.3.6.A1 Planning the Use of VPNs (B)
is blocked by APP.4.3.A1 Creation of a Security Policy for Database Systems (B)
is blocked by APP.4.3.A25 Security Audits of Database Systems (H)
is blocked by APP.5.2.A1 Planning the Use of Exchange and Outlook (B)
is blocked by APP.5.2.A2 Selecting an Exchange Infrastructure (B)
is blocked by APP.5.2.A7 Migration of Exchange Systems (S)
is blocked by APP.5.3.A2 Secure Operation of E-Mail Servers (B)
is blocked by APP.5.3.A4 Spam and Virus Protection on E-Mail Servers (B)
is blocked by APP.5.3.A6 Defining a Security Policy for E-Mail (S)
is blocked by APP.5.3.A13 TLS Reporting (H)
is blocked by APP.6.A1 Planning Software Use [Process Owner] (B)
is blocked by APP.6.A2 Drawing Up a Requirements Catalogue for Software [Process Owner] (B)
is blocked by APP.6.A4 Regulation of Software Installation and Configuration [Process Owner] (B)
is blocked by APP.6.A6 Consideration of Recommended Security Requirements (S)
is blocked by APP.6.A7 Selection and Assessment of Potential Software [Process Owner, Procurement Department] (S)
is blocked by APP.6.A8 Regulation of the Availability of Installation Files (S)
is blocked by APP.6.A9 Taking Inventory of Software (S)
is blocked by APP.6.A10 Establishing a Security Policy for Software Use (S)
is blocked by APP.6.A11 Using Plug-ins and Extensions (S)
is blocked by APP.6.A12 Orderly Decommissioning of Software [Process Owner] (S)
is blocked by APP.6.A13 Uninstallation of Software (S)
is blocked by APP.6.A14 Using Certified Software (H)
is blocked by APP.7.A1 Including Aspects of Individual Software in Software Deployment Planning (B)
is blocked by APP.7.A2 Defining Security Requirements for the Software Development Process (B)
is blocked by APP.7.A3 Specification of Security Functions for System Integration [IT Operation Department] (B)
is blocked by APP.7.A4 Commissioning in Line with Requirements [Procurement Department] (B)
is blocked by APP.7.A5 Appropriate Control of Application Development (S)
is blocked by APP.7.A6 Documentation of Individual Software Requirements (S)
is blocked by APP.7.A7 Secure Acquisition of Individual Software (S)
is blocked by APP.7.A8 Early Involvement of the Process Owner in Development-Related Software Tests (S)
is blocked by APP.7.A10 Commissioning Certified Software Development Companies (H)
is blocked by SYS.1.1.A6 Disabling Unnecessary Services (B)
is blocked by SYS.1.1.A11 Defining a Security Policy for Servers (S)
is blocked by SYS.1.1.A12 Planning the Use of Servers (S)
is blocked by SYS.1.1.A13 Procurement of Servers (S)
is blocked by SYS.1.1.A16 Secure Basic Configuration of Servers (S)
is blocked by SYS.1.1.A21 Operational Documentation for Servers (S)
is blocked by SYS.1.1.A22 Integration into Contingency Planning (S)
is blocked by SYS.1.1.A23 Monitoring Systems and Servers (S)
is blocked by SYS.1.1.A24 Security Checks for Servers (S)
is blocked by SYS.1.1.A35 Drawing Up and Maintaining an Operating Manual (S)
is blocked by SYS.1.1.A33 Active Administration of Root Certificates (H)
is blocked by SYS.1.2.2.A1 Planning of Windows Server 2012 (B)
is blocked by SYS.1.5.A8 Planning a Virtual Infrastructure [Planner] (S)
is blocked by SYS.1.5.A9 Network Planning for Virtual Infrastructure [Planner] (S)
is blocked by SYS.1.5.A10 Introduction of Management Processes for Virtual IT Systems (S)
is blocked by SYS.1.5.A12 Rights and Role Concept for Virtual Infrastructure Administration (S)
is blocked by SYS.1.5.A13 Selection of Suitable Hardware for Virtualisation Environments (S)
is blocked by SYS.1.6.A1 Planning Container Use (B)
is blocked by SYS.1.6.A2 Container Management Planning (B)
is blocked by SYS.1.6.A4 Planning the Provision and Distribution of Images (B)
is blocked by SYS.1.6.A14 Updating Images (S)
is blocked by SYS.1.6.A22 Provision for Investigations (H)
is blocked by SYS.1.6.A25 High Availability of Containerised Applications (H)
is blocked by SYS.1.7.A4 Training z/OS Operators [Supervisor] (B)
is blocked by SYS.1.7.A8 Use of the z/OS Security System RACF (B)
is blocked by SYS.1.7.A9 Multi-Client Capability in z/OS (B)
is blocked by SYS.1.7.A14 Reporting on the Secure Operation of z/OS (S)
is blocked by SYS.1.7.A16 Monitoring of z/OS Systems (S)
is blocked by SYS.1.7.A17 Synchronisation of z/OS Passwords and RACF Commands (S)
is blocked by SYS.1.7.A18 Role Concept for z/OS Systems (S)
is blocked by SYS.1.7.A20 Decommissioning z/OS Systems (S)
is blocked by SYS.1.7.A21 Protection of the Startup Process of z/OS Systems (S)
is blocked by SYS.1.7.A22 Protection of the Operating Functions of z/OS (S)
is blocked by SYS.1.7.A23 Protection of z/VM (S)
is blocked by SYS.1.7.A24 Administration of Storage Media in z/OS Systems (S)
is blocked by SYS.1.7.A25 Stipulation of z/OS System Capacity (S)
is blocked by SYS.1.7.A27 Character Set Conversion in z/OS Systems (S)
is blocked by SYS.1.7.A28 Licence Key Management for z/OS Software (S)
is blocked by SYS.1.7.A31 Contingency Planning for z/OS Systems (S)
is blocked by SYS.1.7.A32 Determining Standards for z/OS System Definitions (H)
is blocked by SYS.1.7.A34 Batch Job Planning for z/OS Systems (H)
is blocked by SYS.1.7.A37 Parallel Sysplex in z/OS (H)
is blocked by SYS.1.8.A7 Planning of Storage Solutions (S)
is blocked by SYS.1.8.A8 Selecting an Appropriate Storage Solution (S)
is blocked by SYS.1.8.A9 Selection of Suppliers for a Storage Solution (S)
is blocked by SYS.2.2.2.A4 Procurement of Windows 8.1 (S)
is blocked by SYS.2.2.2.A10 Integration of Online Accounts into the Operating System [User] (S)
is blocked by SYS.2.2.2.A11 Configuration of Synchronisation Mechanisms in Windows 8.1 (S)
is blocked by SYS.2.2.2.A12 Secure Central Authentication of Windows Networks (S)
is blocked by SYS.2.2.2.A18 Activation of the Last Access Time Stamp (H)
is blocked by SYS.2.2.3.A1 Planning the Use of Cloud Services for Windows 10 (B)
is blocked by SYS.2.2.3.A2 Selecting and Procuring a Suitable Windows 10 Version (B)
is blocked by SYS.2.2.3.A20 Use of User Account Control (UAC) for Privileged Accounts (S)
is blocked by SYS.2.2.3.A24 Activation of the Last Access Time Stamp (H)
is blocked by SYS.2.4.A1 Planning the Secure Use of macOS (B)
is blocked by SYS.2.4.A3 Use of Suitable User Accounts [User] (B)
is blocked by SYS.2.4.A6 Using Up-To-Date Mac Hardware (S)
is blocked by SYS.2.4.A7 Two-Factor Authentication for Apple IDs [User] (S)
is blocked by SYS.2.4.A8 No iCloud Use for Confidential Data [User] (S)
is blocked by SYS.2.4.A10 Activating the Personal Firewall in macOS (S)
is blocked by SYS.2.4.A11 Disposing of Macs (S)
is blocked by SYS.3.1.A1 Rules for Mobile Laptop Use (B)
is blocked by SYS.3.1.A6 Security Guidelines for Laptops (S)
is blocked by SYS.3.1.A7 Orderly Issue and Return of Laptops [User] (S)
is blocked by SYS.3.1.A15 Appropriate Selection of Laptops [Procurement Department] (S)
is blocked by SYS.3.1.A16 Central Administration and Administration of Laptops (H)
is blocked by SYS.3.2.1.A1 Definition of a Policy for Using Smartphones and Tablets (B)
is blocked by SYS.3.2.1.A2 Drawing Up a Strategy for Cloud Usage (B)
is blocked by SYS.3.2.1.A3 Secure Basic Configuration for Mobile Devices (B)
is blocked by SYS.3.2.1.A5 Operating System and App Updates (B)
is blocked by SYS.3.2.1.A10 Policy for Employees Regarding the Use of Mobile Devices [User] (S)
is blocked by SYS.3.2.1.A13 Rules Regarding Screen Sharing and Casting (S)
is blocked by SYS.3.2.1.A22 Integrating Mobile Devices into Internal Infrastructure via VPN (S)
is blocked by SYS.3.2.1.A31 Regulation of Mobile Payments (S)
is blocked by SYS.3.2.2.A1 Determining a Strategy for Mobile Device Management (B)
is blocked by SYS.3.2.2.A2 Defining Admissible Mobile Devices (B)
is blocked by SYS.3.2.2.A3 Selecting an MDM Product (B)
is blocked by SYS.3.2.2.A20 Regular Review of the MDM System (B)
is blocked by SYS.3.2.2.A21 Administration of Certificates (S)
is blocked by SYS.3.2.2.A22 Remote Deletion and Decommissioning of End Devices (S)
is blocked by SYS.4.1.A1 Planning the Use of Printers, Copiers, and All-in-One Devices (B)
is blocked by SYS.4.1.A4 Drawing Up a Security Policy for the Use of Printers, Copiers, and All-in-One Devices (S)
is blocked by SYS.4.1.A18 Configuration of Printers, Copiers, and All-in-One Devices (S)
is blocked by SYS.4.1.A21 Extended Protection of Printers, Copiers, and All-in-One Devices (H)
is blocked by SYS.4.3.A1 Rules for Handling Embedded Systems (B)
is blocked by SYS.4.3.A4 Creating Procurement Criteria for Embedded Systems [Procurement Department] (S)
is blocked by SYS.4.3.A12 Selection of a Trustworthy Supplier and Logistics Chain and a Qualified Manufacturer for Embedded Systems [Procurement Department] (H)
is blocked by SYS.4.4.A1 Criteria for Using IoT Devices (B)
is blocked by SYS.4.4.A6 Integration of IoT Devices into Organisation Security Policies (S)
is blocked by SYS.4.4.A7 Planning the Use of IoT Devices (S)
is blocked by SYS.4.4.A8 Procurement Criteria for IoT Devices [Procurement Department] (S)
is blocked by SYS.4.4.A9 Controlling the Use of IoT Devices (S)
is blocked by SYS.4.4.A10 Secure Installation and Configuration of IoT Devices (S)
is blocked by SYS.4.4.A20 Controlled Decommissioning of IoT Devices (S)
is blocked by SYS.4.4.A21 Operational Environment and Power Supply [Building Services] (H)
is blocked by SYS.4.4.A23 Auditing of IoT Devices (H)
is blocked by IND.1.A1 Integration into the Security Organisation (B)
is blocked by IND.1.A5 Development of a Suitable Zone Concept [Planner] (S)
is blocked by IND.1.A11 Secure Procurement and System Development (S)
is blocked by IND.1.A21 Documentation of Communication Relationships [OT Operations (Operational Technology, OT)] (S)
is blocked by IND.2.3.A1 Installation of Sensors [OT Operations, Maintenance Personnel] (B)
is blocked by IND.2.3.A3 Wireless Communication (H)
is blocked by IND.2.4.A1 Remote Maintenance by Mechanical and System Engineers [OT Operations] (B)
is blocked by IND.2.7.A6 Secure Planning and Specification of SIS [Planner, Maintenance Personnel, ICS Information Security Officer] (S)
is blocked by IND.3.2.A1 Planning the Use of Remote Maintenance in OT (B) [Planner]
is blocked by IND.3.2.A2 Consistent Documentation of Remote Maintenance by OT and Office and Building IT (B) [IT Operation Department, Maintenance Personnel]
is blocked by IND.3.2.A3 Regular Checks and Exceptions for Existing OT Remote Maintenance Access (B) [IT Operation Department]
is blocked by IND.3.2.A4 Binding Regulation of OT Remote Maintenance by Third Parties (B)
is blocked by IND.3.2.A5 Internal Coordination for OT Remote Maintenance with Office and Building IT (B) [Planner]
is blocked by IND.3.2.A12 Dedicated OT Remote Maintenance Solution (H) [Planner]
is blocked by IND.3.2.A14 Technical Control of Remote Maintenance Sessions (H) [Planner, Data Protection Officer]
is blocked by NET.1.1.A3 Specification of Network Requirements (B)
is blocked by NET.1.1.A11 Protection of Communications Entering the Internal Network from the Internet (B)
is blocked by NET.1.1.A13 Network Planning (B)
is blocked by NET.1.1.A14 Implementation of Network Planning (B)
is blocked by NET.1.1.A16 Specification of Network Architecture (S)
is blocked by NET.1.1.A20 Allocation of Dedicated Sub-Networks for IPv4/IPv6 End Device Groups (S)
is blocked by NET.1.1.A21 Separation of the Management Area (S)
is blocked by NET.1.1.A25 Detailed and Implementation Planning of Network Architecture and Design (S)
is blocked by NET.1.1.A26 Specification of Operating Processes for the Network (S)
is blocked by NET.1.2.A1 Network Management Planning (B)
is blocked by NET.1.2.A2 Specification of Network Management Requirements (B)
is blocked by NET.1.2.A13 Drawing Up a Network Management Concept (S)
is blocked by NET.1.2.A14 Detailed and Implementation Planning (S)
is blocked by NET.1.2.A15 Concept for Secure Operation of Network Management Infrastructure (S)
is blocked by NET.1.2.A35 Specifications for Securing Evidence (H)
is blocked by NET.1.2.A36 Integration of Network Management Logging into an SIEM Solution (H)
is blocked by NET.1.2.A38 Specification of Forms of Emergency Operations for Network Management Infrastructure (H)
is blocked by NET.2.1.A1 Definition of a Strategy for WLAN Usage (B)
is blocked by NET.2.1.A2 Selection of a Suitable WLAN Standard [Planner] (B)
is blocked by NET.2.1.A3 Selection of Suitable Crypto Methods for WLAN [Planner] (B)
is blocked by NET.2.1.A4 Suitable Location of Access Points [Building Services] (B)
is blocked by NET.2.1.A7 Setting Up a Distribution System [Planner] (B)
is blocked by NET.2.1.A9 Secure Connection of WLANs to a LAN [Planner] (S)
is blocked by NET.2.1.A10 Drawing Up a Security Policy for WLAN Operation (S)
is blocked by NET.2.1.A11 Selection of Suitable WLAN Components (S)
is blocked by NET.2.2.A1 Creating a User Policy for WLAN [IT Operation Department] (B)
is blocked by NET.2.2.A2 Awareness and Training of WLAN Users [Supervisor, IT Operation Department] (B)
is blocked by NET.3.1.A1 Secure Basic Configuration of a Router or Switch (B)
is blocked by NET.3.1.A13 Administration Using a Separate Management Network (S)
is blocked by NET.3.1.A22 Contingency Planning for Routers and Switches (S)
is blocked by NET.3.2.A1 Creating a Security Policy (B)
is blocked by NET.3.2.A14 Operational Documentation (B)
is blocked by NET.3.2.A15 Procuring a Firewall (B)
is blocked by NET.3.2.A32 Firewall Contingency Planning (S)
is blocked by NET.3.2.A26 Outsourcing of Functional Extensions to Dedicated Hardware (H)
is blocked by NET.3.3.A1 Planning the Use of VPNs (B)
is blocked by NET.3.3.A3 Secure Installation of VPN End Devices (B)
is blocked by NET.3.3.A6 Analysis of VPN Requirements (S)
is blocked by NET.3.3.A8 Drawing Up a Security Policy for VPN Usage (S)
is blocked by NET.4.1.A1 Requirements Analysis and Planning for Telecommunications Systems [IT Operation Department] (B)
is blocked by NET.4.1.A2 Selection of Telecommunications Service Providers [IT Operation Department] (B)
is blocked by NET.4.1.A6 Creating a Security Policy for Telecommunications Systems [IT Operation Department] (S)
is blocked by NET.4.1.A13 Acquisition of Telecommunications Systems (S)
is blocked by NET.4.2.A1 Planning the Use of VoIP (B)
is blocked by NET.4.2.A9 Selection of Suitable VoIP Components (S)
is blocked by NET.4.2.A15 Secure Media Transport Using SRTP (H)
is blocked by NET.4.2.A16 Network Separation for Data and VoIP (H)
is blocked by NET.4.3.A1 Suitable Siting of a Fax Machine [Building Services] (B)
is blocked by NET.4.3.A2 Information for Employees on Using Fax Machines (B)
is blocked by NET.4.3.A4 Drawing Up a Security Policy for Fax Use (S)
is blocked by NET.4.3.A6 Procurement of Suitable Fax Machines and Servers [Procurement Department] (S)
is blocked by NET.4.3.A7 Suitable Labelling of Outgoing Fax Transmissions [User] (S)
is blocked by INF.1.A1 Planning the Building Protection [Planner] (B)
is blocked by INF.1.A3 Compliance with Fire Prevention Regulations (B)
is blocked by INF.1.A4 Fire Detection in Buildings [Planner] (B)
is blocked by INF.1.A5 Hand-Held Fire Extinguishers (B)
is blocked by INF.1.A10 Compliance with Relevant Standards and Regulations [Construction Company, Construction Manager] (B)
is blocked by INF.1.A9 Security Concept for Building Use [Planner] (S)
is blocked by INF.1.A12 Key Management (S)
is blocked by INF.1.A14 Lightning Protection Devices (S)
is blocked by INF.1.A17 Structural Smoke Protection [Planner] (S)
is blocked by INF.1.A18 On-Site Fire Safety Inspections (S)
is blocked by INF.1.A19 Notification of the Fire Safety Officer (S)
is blocked by INF.1.A25 Selection of Appropriate Locations [Top Management] (A)
is blocked by INF.1.A30 Selection of an Appropriate Building (H)
is blocked by INF.1.A31 Moving Out of Buildings [Central Administration] (H)
is blocked by INF.1.A32 Firestop Seal Register (H)
is blocked by INF.5.A1 Planning the Room Protection [Planner] (B)
is blocked by INF.5.A12 Protection Against Accidental Damage to Supply Lines [Planner] (S)
is blocked by INF.7.A1 Suitable Selection and Use of an Office Room [Supervisor] (B)
is blocked by INF.7.A3 Exposed Cables (S)
is blocked by INF.9.A1 Appropriate Selection and Usage of a Mobile Workplace [IT Operation Department] (B)
is blocked by INF.9.A2 Regulations for Mobile Workplaces [Human Resources Department] (B)
is blocked by INF.9.A6 Disposal of Confidential Information [Employee] (S)
is blocked by INF.9.A8 Security Policy for Mobile Workplaces [IT Operation Department] (S)
is blocked by INF.10.A5 Exposed Cables (S)
is blocked by INF.10.A7 Secure Configuration of Training and Presentation Computers [IT Operation Department] (S)
is blocked by INF.11.A1 Planning and Procurement [Process Owner, Procurement Department, Data Protection Officer] (B)
is blocked by INF.11.A2 Maintenance, Inspection, and Updates [Process Owner, IT Operation Department] (B)
is blocked by INF.11.A3 Regulations for the Use of Vehicles [IT Operation Department, Process Owner, User, Data Protection Officer] (B)
is blocked by INF.11.A4 Creating a Security Policy [Process Owner, IT Operation Department] (S)
is blocked by INF.11.A5 Drawing Up a Security Concept (S)
is blocked by INF.11.A6 Establishing Instructions [Process Owner, User] (S)
is blocked by INF.11.A7 Proper Handling of Vehicles and Sensitive Information [Process Owner, User] (S)
is blocked by INF.11.A9 Ensuring Fuel Supplies [Process Owner] (S)
is blocked by INF.12.A1 Selection of Appropriate Cable Types [IT Operation Department, Building Services] (B)
is blocked by INF.12.A2 Planning Cable Routing [IT Operation Department, Building Services] (B)
is blocked by INF.12.A6 Cabling Approval [IT Operation Department, Building Services] (S)
is blocked by INF.12.A7 Overvoltage Protection [Building Services] (S)
is blocked by INF.12.A8 Removing and Disabling Cables No Longer Required [IT Operation Department, Building Services] (S)
is blocked by INF.12.A10 Documentation and Labelling of Cabling [IT Operation Department, Building Services] (S)
is blocked by INF.13.A1 Assessment of the Current Situation When Taking Over Existing Buildings (B)
is blocked by INF.13.A2 Regulation and Documentation of Responsibilities and Authorities in the Building [Top Management, Planner] (B)
is blocked by INF.13.A3 Documentation of Building Facilities (B)
is blocked by INF.13.A4 Creation of a Security Policy for TBM (S)
is blocked by INF.13.A5 Planning TBM (S) [Planer]
is blocked by INF.13.A6 Drawing Up a TBM Concept (S) [Planner]
is blocked by INF.13.A8 Creation and Maintenance of an Inventory for TBM (S) [Planner]
is blocked by INF.13.A9 Regulation of the Use of Computer-Aided Facility Management (S) [Planner]
is blocked by INF.13.A10 Regulation of the Use of Building Information Modelling (S) [Planner]
is blocked by INF.13.A14 Consideration of Special Roles and Authorisations in TBM (S)
is blocked by INF.13.A16 Process for Changes in TBM (S)
is blocked by INF.13.A17 Provisions for Maintenance and Repairs in TBM (S)
is blocked by INF.13.A18 Proactive Maintenance in TBM (S) [Planner]
is blocked by INF.13.A19 Conceptualisation and Implementation of Monitoring in TBM (S) [Planner]
is blocked by INF.13.A20 Provisions for Event Management in TBM (S) [Planner]
is blocked by INF.13.A21 Logging in TBM (S)
is blocked by INF.13.A22 Performing System Tests in TBM (S) [Planner]
is blocked by INF.13.A23 Integration of TBM into Vulnerability Management (S)
is blocked by INF.13.A24 Ensuring Control of Cloud-Based Processes for TBM (S) [Planner]
is blocked by INF.13.A25 Establishment of a Test Environment for TBM (H) [Planner]
is blocked by INF.13.A27 Establishment of a Private Cloud for TBM (H) [Planner]
is blocked by INF.13.A28 Secure Use of Artificial intelligence in TBM (H)
is blocked by INF.13.A29 Integration of TBM into SIEM (H) [IT Operation Department]
is blocked by INF.14.A1 Planning BACS (B) [Planner]
is blocked by INF.14.A2 Defining Commissioning and Interface Management for BACS (B)
is blocked by INF.14.A3 Secure Connection of Building Services and Building Services Systems (B)
is blocked by INF.14.A4 Consideration of Hazard Detection Systems in BACS (B) [Planner]
is blocked by INF.14.A5 Documentation of BACS (B)
is blocked by INF.14.A7 Drawing Up a Security Policy for BACS (S)
is blocked by INF.14.A8 Requirements Specification for BACS (S)
is blocked by INF.14.A9 Developing a BACS Concept (S)
is blocked by INF.14.A10 Formation of Independent BACS Areas (S) [Planner]
is blocked by INF.14.A14 Use of BACS-Appropriate Access Protection (S)
is blocked by INF.14.A22 Ensuring Autonomous Functioning of BACS and Building Services Systems (S) [Planner]
is blocked by INF.14.A24 Time Synchronisation for BACS (S)
is blocked by INF.14.A25 Dedicated Monitoring in BACS (S)
is blocked by INF.14.A26 Logging in BACS (S)
is blocked by INF.14.A27 Consideration of Interactions Between BACS Components in Contingency Planning (S)
is blocked by INF.14.A30 Provision of a Dedicated BACS Time Server for Time Synchronisation (H)