+DER.3.2.A7 Performance of an IS Audit [IS Audit Team] (B)

DER.3.2.A7 Performance of an IS Audit [IS Audit Team] (B)

Within the framework of an IS audit, the IS Audit Team MUST perform a document audit and an on-site audit. All the results of the two audits MUST be documented in writing and summarised in an IS audit report.

Before performing an IS cross-cutting audit for the first time, the person in charge of the IS audit MUST select an IS partial audit as the IS audit procedure. The IS partial audit MUST be completed with a positive result before an IS cross-cutting audit is performed.

1. Apžvalga

Pavadinimas Standartas

1.1 Nuorodos

1.2 Nustatyti reikalavimai

1.3 Susiję teisės aktai

2. Nustatyti reikalavimai

Reikalavimai
Šaltinis Reikalavimas

3. Susiję teisės aktai

Teisės aktai
Šaltinis Reguliavimas

Susietos užduotys

Saitai
Saito tipas Užduotis
blocks G 0.18 Poor Planning or Lack of Adaptation